yesterday the Excellent Trim Carpenter worked on the middle section of the S wall. a new baseband is in place, the remaining old siding has been tied into it, and a trim piece is now in place at the join between levels.
by the time I got back home there wasn't enough usable light for decent pictures; these were taken this morning.
(click through these thumbnails for higher resolution images)
the plywood sheeting was put back in place just to close up the exterior face of the wall for the time being; it will be replaced with new boards as they are run off.
he also primed and installed the exterior trim piece over the new old window, seen here with backlit crabapple leaves in the foreground.