things to do ...
as the first phase (reporchment and refenestration) approaches, one hopes, completion here's the open task list:
- check out N wall rot spots and determine method for dealing with them
- add exterior flooring to fill gap where N wall has retreated
- install N wall cap piece
- electrical: reapply interior light switch, interior and exterior outlets
- insulation: apply to W wall, perhaps to side walls? if feasible
- install window guides and hardware (latches, pulleys, sash weights)
- locate and apply misc. hardware items (keepers for the mortise lock and mortise bolts).
- close up W wall interior with beadboard
- design, fabricate and install pediment over doors and windows
- review top front step geometry and possibly rework it: the top step is too shallow and with its "trip lip" overhang constitutes a potential safety hazard
- caulk, seal, prepare and paint exterior
- fabricate storm windows and screens